Product Line:

Isolated Power Panels     Model IDP     Model IDC     Model DIDP     Model XTLD

  • Description
  • Components
  • Safety
  • Accessories
  • Installation
  • Application
  • Sizes & Ordering
  • Specifications
  • Engineering Data
          -  Load Analysis
          -  Installation Checkout
    Procedure
          -  Isolated Power
    Systems
    Explanation
  • Download Drawings
  •     Model IDC: Installation

    The Model IDC Isolated Power Center is designed for quick and simple field installation. The back box is installed first, during the "roughing-in" phase, allowing the contractor to mount the box as the walls are being erected. The back box must be located in accordance with NEC requirements. The subpanel and front trim are installed during the "final" construction phase.

    The transformer, LIM, circuit breakers, and all other components are preassembled on the subpanel and wired at the factory. The contractor needs only to mount the subpanel inside the back box and connect the primary feeder, branch circuits and signal conductors. Ample space is provided for field wiring.

    Field checkout, equipment certification and staff orientation by a PG LIFELINK factory representative is available.


    BACK TO TOP
    Products I  Company Info I  Contact Us I  Careers I  Site Map I  Home

    © Copyright 2009 PG LifeLink Inc.
    All Rights Reserved.    Created by Upright Communications.